Project: Bluepoints Marina (2011)
“Their dogged persistence, hard work, and experience proved invaluable to us throughout the project, facilitating permitting, problem-solving and design collaboration among our many consultants. Through value engineering and cost savings methods, W+J Construction was able to save us over $500,000 of the original estimated costs.”