Sun Nuclear Corp.

The renovation is approximately 26,000 square feet with an additional 3,800 square feet of training center combined with a mock linear accelerator bunker. The project had a very aggressive schedule of 120 days and W&J Construction met each milestone requirement. Sun Nuclear HQ is located in Melbourne, FL.

Read more

Secured Facilities Experience

Inspection Rooms & Holding Cells Specialized secure areas for the protection of the public in busy facilities such as: -Harry T. & Harriette V. Moore Justice Center -US Customs & Immigration, Cruise Terminal 5 -Palm Bay Police and Fire Station Vaults Heavy duty protection of valuables for the following: -Devereux Children’s Foundation -Banks -Harris Corporation […]

Read more

Harris Corporation Special Test Equipment Bldg. #27

Palm Bay, Florida This building is a high-bay structure 115 feet in height, covering 58,000 square feet.  The roof trusses weigh over 75 tons each and span 240 feet.  The building contains a self supporting, all welded catwalk system with a a clear structural steel.  The exterior wall system is constructed of panels fabricated on-site from structural steel framing, rigid […]

Read more

Harris Corporation Malabar Phase 1

Harris Government Systems Sector Palm Bay, Florida A totally self-sufficient facility, the two-story Government Systems building at Malabar has it’s own infrastructure utility system, including it’s own water wells, water tower, water distribution system, and sewage collection and treatment system. The combination office and manufacturing facility required the fabrication and erection of 1,100 tons of […]

Read more

Grumman Administration and Technical Facilities

Melbourne, Florida One of the most outstanding examples of how W&J Construction performs is this fast track project for Grumman. Construction proceeded in stages as the design and tail end tenant fit up. Used by Grumman in the design and development of the “Joint Stars” Battlefield Reconnaissance/Surveillance System, the four-story, 190,000 square foot building is […]

Read more

Cocoa Warehouses

Cocoa, Florida Construction Manager – 43,500 sq ft of warehousing for the School Board of Brevard.  The renovation of the 520 Cocoa Warehouse was completed in 2 phases.  Phase 1 included the demolition of all existing mechanical and electricalunits and the associated piping, demo of interior walls, offices and structures, all roofing and siding panels […]

Read more

Bluepoints Marina

Port Canaveral, Florida Bluepoints International Fisheries, Inc. is redeveloping  an existing fishery facility into a marina on Scallop Drive in Port Canaveral. The project consists of the final design and construction of a 588-slip dry storage marina on the 8 acre waterfront site. Marine structures will include fixed and floating docks, as well as, pile […]

Read more

Milliken’s Reef Restaurant

Port Canaveral, Florida Milliken’s Reef is the  ”Cove’s” newest restaurant at Port Canaveral. The West Indies design and openness created by fully operable Nana Wall windows provide spectacular waterfront views and dining. The restaurant also features a “sand bar”, Tiki Bar and bandstand.

Read more

TRDA Business Innovation Center

Melbourne, Florida As part of a five-year contract with the Melbourne Airport Authority, W & J was the Construction Manager for the TRDA (Technical Research & Development Authority) facility. This contemporary, 30,000 square-foot office building, located at the corner of Grumman Place and NASA Boulevard in Melbourne, was built for the City of Melbourne Airport […]

Read more